![](https://i2.wp.com/www.antomarengineering.com/wp-content/uploads/2017/08/portfolio-006.jpg?resize=1140%2C876&ssl=1)
Reconstruction and resurfacing of the S.P. 12 between the Polino torrent and the graft with the Olivo dam
Total amount for works € 1.050.527,00
Reconstruction and resurfacing of the S.P. 12 between the Polino torrent and the graft with the Olivo dam
Total amount for works € 1.050.527,00